Event-Driven MRP at Manufacturing Scale: Governed Replanning, Coordinated Replenishment and Dispatch, and an Industrial Implementation
DOI:
https://doi.org/10.47392/IRJAEH.2026.0754Keywords:
material requirements planning, event-driven architecture, shipment consolidation, multi-echelon replenishmentAbstract
Material requirements planning (MRP) is still at the core of discrete manufacturing, but many MRP implementations are still done as scheduled batch runs. This paper questions if event-driven architecture (EDA) can be a defensible execution model for specific planning decisions, such as inventory replenishment and outbound shipment consolidation. The search results from a documented search in Scopus, Web of Science, IEEE Xplore and ScienceDirect from January 2020 to December 2025 were processed and integrated in a structured narrative review, consisting of three streams: MRP and production-plan stability; shipment consolidation and coordinated replenishment–dispatch decisions; and event-driven, digital-twin and Industry 4.0 infrastructure. Although demand-driven MRP and rolling-horizon planning and product-driven control can enhance responsiveness, buffer positioning, review frequency and parameter calibration are still important and somewhat subjective. Different cost and service results are obtained with time-, quantity- and hybrid consolidation policies, and the inbound replenishment and outbound dispatch are found to be coupled. Technically possible to have near real-time state synchronisation, dynamic scheduling and replayable An industrial application of this principle, namely an event-triggered, multi-echelon planning platform, is then presented, including event-driven run authorisation, parallel computation under bill-of-materials and network dependency ordering, planning controls, multi-sourcing, shipment consolidation, product-lifecycle handling, and shadow validation against an incumbent planning engine before cutover. A reference architecture and its failure semantics are specified. The remaining research gap is narrowed to coordinated replenishment and dispatch under governed, event-driven planning, and in particular to controlled industrial evaluation.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2026 International Research Journal on Advanced Engineering Hub (IRJAEH)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
.