Intelligent Enterprise Transformation: A Closed-Loop Reference Architecture for Automating SAP Application Lifecycle Management Through Scalable Change and Deployment Governance
DOI:
https://doi.org/10.47392/IRJAEH.2026.0758Keywords:
SAP Solution Manager, ; Change Request Management, SAP Cloud ALM, Change and Deployment ManagementAbstract
In enterprise resource planning (ERP) environments, the business process logic, configuration, custom development, master data, authorisation design and financial controls are all interdependent and are tightly integrated in one operating environment. The route to production of a change is thus at the same time a delivery mechanism and a preventive control. In this research work, a platform-independent reference architecture for scalable governance of SAP changes and deployments is designed and partially evaluated, which can be realised by SAP Solution Manager Change Request Management (ChaRM) and SAP Cloud ALM Change and Deployment Management (CDM). The study adopts design science research approach. A knowledge base was synthesised from a variety of topics from continuous delivery, DevOps, ERP lifecycle risk, IT governance, access control, software configuration management and process mining; automated checks, ALM change and deployment orchestration, governance and control, and measurement and feedback. In production, one control objective was evaluated, namely the parallel-track reconciliation, for greenfield SAP S/4HANA programmes running N and N+1 maintenance landscapes. The remaining 5 per cent are due to the following 3 halting conditions: object conflicts, object locks and SAP Note content owned by the vendor. Automation is not a discharge of a control objective, but it is a partition of it: mechanical reconciliation is a repeatable logged operation, semantic reconciliation is isolated and passed to human judgement. The marginal effort per change decreases, while the correlated specification risk increases due to the fact that one bad rule can be passed on to many people. The exception ownership, process conformance, outcome monitoring and periodic policy review are therefore architectural aspects of the production change-control loop and not post hoc reporting activities.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2026 International Research Journal on Advanced Engineering Hub (IRJAEH)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
.